← The AI Power Bill

Cycle on Jun 29, 2026

Ran 8m 25s · 4 findings · 10 searches · 8 fetches

No events yet. The agent's first move will appear here in a moment.

Agent
I will begin by listing the open threads and watches for this research topic to see what questions or catalysts have been prioritized or registered in past cycles.
Listed threads
Agent
I will list the current set of notes to understand the prior findings in more detail.
Read prior notes
Agent
The user is interested in tracking the regional, investable exposure map of the AI data center buildout: utilities, grids, and regions absorbing the load, where consumer bills are rising, and who profits or pays. Let's see: we have some specific watches running: 1. `Louisiana PSC Decision on Entergy's Seven New Gas Plants for Meta` (LPSC ruling on Entergy Louisiana's 7-plant application). 2. `PJM Accelerated Backstop Reliability Auction Results` (September 2026). 3. `Oregon PUC Final Decision on PGE Schedule 96 Rates` (expected July 7, 2026). 4. `PJM 2028/2029 Capacity Auction Closes under Price Collar` (expected July 7, 2026). Wait, today's date is June 29, 2026. Let's check if there are updates on any of these watches, or if there is new news regarding Entergy Louisiana, Portland General Electric (PGE) Schedule 96, PJM 2028/2029 capacity auction preparations, or other utility rate cases and data center decisions. I'll do a web search. First, let's search for "Entergy Louisiana" "Meta" "gas plants" LPSC. Let's also search for "Portland General Electric" "Schedule 96" "Oregon PUC". And maybe check other recent utility earnings or data center tariff filings (like Duke Energy, Georgia Power, Dominion, Constellation, Vistra, etc.). Let's run a search for Portland General Electric Schedule 96 first.
🔍 Search
"Portland General Electric" "Schedule 96" OR "data center" "Oregon PUC" 2026
No results.
Agent
Let's fetch the RTO Insider and OPB articles, or the Utility Dive one, to get the details of what happened with Oregon PUC and Portland General Electric's Schedule 96 rates. Wait, let's search specifically for the May or June 2026 developments on PGE and Oregon PUC. Let's fetch `https://www.rtoinsider.com/131475-pge-expects-decision-soon-data-center-rate-hile/` and `https://www.opb.org/article/2026/05/12/portland-general-electric-oregon-power-data-centers/` and `https://www.utilitydive.com/news/oregon-puc-approves-pges-large-load-tariff-framework-for-data-centers/821361/` to see the details of PGE's Schedule 96. Let's do that!
📥 Fetch
https://www.utilitydive.com/news/oregon-puc-approves-pges-large-load-tariff-framework-for-data-centers/821361/
Agent
This is a very important piece of news. It shows that on May 7, 2026, the Oregon PUC approved PGE's Schedule 96 large-load tariff framework for data centers exceeding 20 MW, which took effect June 10, 2026. Wait, let's look at the watch: `Oregon PUC Final Decision on PGE Schedule 96 Rates` "The Oregon Public Utility Commission is scheduled to announce its final decision on Portland General Electric's Schedule 96 data center rate plan on July 7, 2026. The plan proposes a 29% rate increase for large-load data centers and a 1.3% rate decrease for residential customers. Future cycles must track if this is approved and the final rate structure. Fire date: 2026-07-08T00:00:00Z. Trigger: Oregon PUC releases its final decision on PGE's 29% data center rate increase." Wait, let's check the details of this. The Utility Dive article says: "The Oregon Public Utility Commission order is the first major implementation of Oregon’s 2025 POWER Act in Portland General Electric territory... PGE must submit revised tariffs by June 3. The new schedules take effect June 10, while requests for rehearing are due July 6, leaving open the possibility of additional regulatory action." Wait, let's search if there has been another decision or if the "final decision on the 29% data center rate increase" is scheduled for July 7, 2026, or if the May 7 decision was the framework and the actual rate case/Schedule 96 rates are being decided on July 7. Let's search for "Portland General Electric" "Schedule 96" OR "large load" "July 7, 2026" OR "July 2026" OR "29%". Let's run a web search.
🔍 Search
"Portland General Electric" "Schedule 96" OR "29%" OR "July 7, 2026" OR "July 2026"
No results.
Agent
This is extremely relevant! Portland General Electric filed for regulatory approval on June 3, 2026, for a 29% rate increase for large-load data center customers, while proposing a 1.3% rate decrease for residential customers, as part of implementing Schedule 96 under Oregon's 2025 POWER Act (HB 3546). Let's search for "Portland General Electric" "Schedule 96" "June 2026" or "July 7, 2026" to find the exact details of the filing, and check if it's already approved or if the Oregon PUC is scheduled to make a final decision on July 7, 2026. Let's fetch `https://www.opb.org/article/2026/06/04/data-centers-utility-rate-pge/` and `https://portlandgeneral.com/news/2026-06-pge-delivers-on-commitment-to-ensure-growth-pays-for-growth`. Let's do that!
📥 Fetch
https://portlandgeneral.com/news/2026-06-pge-delivers-on-commitment-to-ensure-growth-pays-for-growth
Agent
Wow, this is fantastic! It precisely updates the status of the Portland General Electric (PGE) Schedule 96 rate filing. Let's analyze this: - PGE filed for regulatory approval on June 3, 2026, for new rates under Schedule 96 (implementing Oregon's POWER Act, HB 3546). - The proposed rate changes: - Large-load data center customers: 29% increase - Residential customers: 1.3% decrease - Small business: 3.7% decrease - Commercial: 2.2% decrease - Industrial: 1.5% decrease - On June 9, 2026, the Oregon Public Utility Commission voted to delay approving new customer rates to allow additional time to review the proposal. - A new vote is scheduled to take place during the **July 7, 2026** public meeting. - This is an active, unresolved watch! The fire date is July 8, 2026 (or rather, the event will happen on July 7, 2026). - Since it hasn't happened yet (today is June 29, 2026), we should NOT resolve this watch or record an event yet, as the vote is on July 7. However, we can write a comprehensive update finding on this, or update an existing finding if there is one. Let's see if there is an existing finding for PGE or Oregon. Looking at the list of notes: - `georgia-power-large-load-contracting-framework` - `aep-ohio-data-center-tariff-puco-approval` - `kkr-vistra-helix-digital-infrastructure-ai-power` - `louisiana-ai-data-center-power-boom` - `amazon-talen-energy-nuclear-ppa-pivot` - `regulatory-backlash-data-center-ratepayer-protections` - `constellation-energy-acquires-calpine-three-mile-island-restart` - `pjm-2027-2028-capacity-auction-price-cap` - `maryland-opc-pjm-transmission-cost-complaint` - `pjm-deploys-reliability-backstop-procurement-framework` - `ferc-approves-pjm-capacity-price-collar-extension` - `quantitative-evidence-data-center-ratepayer-subsidies` Wait, we don't have a specific finding for PGE or Oregon yet, except that Oregon is mentioned in `regulatory-backlash-data-center-ratepayer-protections` perhaps. Let's read that note to see what it contains. Wait, let's fetch the note `regulatory-backlash-data-center-ratepayer-protections` or read it. Wait, can I read notes using `read_notes`? `read_notes` returns the list with previews. To see the full content of a note, is there a tool? No, wait, `read_notes` returns the notes. Let's see if there is another tool. Ah! There's no "read_note_by_slug" tool, but wait, `read_notes` returns slug, title, preview, updated_at, and source_count. Wait! Let's search if there are other tools. Ah, the declarations only show: - `list_threads` - `market_view` - `read_notes` - `record_event` - `record_thread` - `record_watch` - `resolve_thread` - `web_fetch` - `web_search` - `write_note` - `finish_cycle` So there is no tool to read the full body of a note other than `read_notes` which gives a preview. But `read_notes` does not give the full body if it's long. Wait, let's check if we can get more by calling `read_notes` with a higher limit or if there is another way. No, `read_notes` returns slug, title, preview, updated_at, and source_count. That is fine, we can find out what we need. Wait, the note `regulatory-backlash-data-center-ratepayer-protections` has preview: "As the AI data center buildout accelerates, a massive regulatory and legislative backlash has erupted across the United States. State public utility commissions (PUCs), state legislatures, and…" Let's see if we should write a new note specifically for Oregon and PGE, or if we should update `regulatory-backlash-data-center-ratepayer-protections`. Wait! The guidelines say: "One finding = ONE coherent subject tracked under one stable slug across cycles — a developing story, a running debate, or an entity's trajectory — NOT a fresh single-story-of-the-day note each cycle." Let's create a durable finding for Oregon and Portland General Electric's Schedule 96 rate design, because it is a landmark implementation of a "growth pays for growth" model under Oregon's 2025 POWER Act, which is a major, precedent-setting rate structure. Let's call it `oregon-pwr-act-pge-schedule-96-tariff` or similar, or we can update `regulatory-backlash-data-center-ratepayer-protections` if it's a general backlash. Actually, Oregon's POWER Act implementation is a very specific, quantitative, and precedent-setting framework (similar to Georgia Power's 15-year framework or AEP Ohio's tariff). Let's see if there are other states. Let's check the other watches: 1. `Louisiana PSC Decision on Entergy's Seven New Gas Plants for Meta` (LPSC ruling on Entergy Louisiana's seven-plant application). Let's search for "Entergy Louisiana" "Meta" "gas plants" LPSC 2026. Let's see if there are updates on this.
🔍 Search
"Entergy Louisiana" "Meta" "gas plants" OR "Richland Parish" "LPSC" OR "Public Service Commission" 2026
No results.
Agent
Wait, this is incredible! The search results show that the Louisiana Public Service Commission (LPSC) has ALREADY approved Entergy Louisiana's major infrastructure/power plant investments for Meta's Richland Parish data center! Let's see: - "Entergy's Meta Center power infrastructure proposal approved" (KNOE8News Facebook post) - "Entergy Louisiana receives LPSC approval for major infrastructure investments to support Meta's data center and improve reliability" (Entergy Louisiana press release) - Let's search for "Entergy Louisiana" "LPSC" "approved" "Meta" "June 2026" or "May 2026" to find the exact date and details of the LPSC approval. Let's do a search!
🔍 Search
"Entergy Louisiana" "LPSC" "approval" OR "approved" "Meta" "Richland Parish" 2026
No results.
Agent
Let's fetch the PR Newswire / Entergy Louisiana release to see the exact details of this approval: `https://www.prnewswire.com/news-releases/entergy-louisiana-receives-lpsc-approval-for-major-infrastructure-investments-to-support-metas-data-center-and-improve-reliability-302535020.html` or `https://www.entergylouisiana.com/entergy-louisiana-receives-lpsc-approval-for-major-infrastructure-investments-to-support-metas-data-center-and-improve-reliability` Let's fetch the PR Newswire article first.
📥 Fetch
https://www.prnewswire.com/news-releases/entergy-louisiana-receives-lpsc-approval-for-major-infrastructure-investments-to-support-metas-data-center-and-improve-reliability-302535020.html
Agent
Wait! This PR Newswire article is from August 20, 2025. Let's look at the watch again: "The Louisiana Public Service Commission (LPSC) must rule on Entergy Louisiana's fast-tracked application to build and operate seven new natural gas-fired power plants to serve Meta's Hyperion AI data center in Richland Parish. Future cycles must track if this is approved and what cost-allocation or ratepayer protection conditions are imposed." And the search results showed: - "The Louisiana Public Service Commission (LPSC) voted today (April 15, 2026) to adopt a fast-track schedule for approving Entergy Louisiana's..." (Union of Concerned Scientists, April 15, 2026) - "Entergy's Meta Center power infrastructure proposal approved" (KNOE8News Facebook post / KNOE8 news) - Let's search for "Entergy Louisiana" "LPSC" "seven" OR "7" "gas plants" OR "power plants" "Meta" 2026 or "April 15, 2026" or "May 2026" or "June 2026". Let's check `https://www.ucs.org/about/news/louisiana-regulators-fast-track-7-gas-plant-proposal-meta-data-center` or look for other articles on the UCS site. Let's do a search!
🔍 Search
"Entergy Louisiana" "LPSC" "7" OR "seven" "gas" OR "combustion" "Meta" 2026
No results.
Agent
This is incredibly rich! Let's fetch some of these articles to get the full story: 1. `https://thelensnola.org/2026/04/14/meta-project-evest-louisiana-energy-expansion-costs-entergy/` 2. `https://www.ucs.org/about/news/louisiana-regulators-fast-track-7-gas-plant-proposal-meta-data-center` 3. `https://www.nola.com/news/environment/meta-entergy-louisiana-data-center-power/article_1fa0f203-cbb3-4736-8ec0-a67867934472.html` 4. `https://louisianaradionetwork.com/2026/04/16/46165/` Let's fetch `https://thelensnola.org/2026/04/14/meta-project-evest-louisiana-energy-expansion-costs-entergy/` first.
📥 Fetch
https://thelensnola.org/2026/04/14/meta-project-evest-louisiana-energy-expansion-costs-entergy/
Agent
This is a very detailed, rich article! Let's examine the facts: - Meta's first data center in Richland Parish is called **"Project Hyperion."** For this, the Louisiana Public Service Commission (LPSC) approved three gas power plants (combined cycle combustion turbine generation facilities - CCCT) in August 2025 (costing $3.2 billion). - Seven months later, in March 2026, Meta announced plans for a massive expansion called **"Project Evest."** - To power Project Evest, Entergy Louisiana asked the LPSC for permission to build an **additional seven gas power plants** on top of the three already approved for Hyperion. - Together, these 10 plants represent an increase equal to roughly a third of Louisiana's current electrical grid (about 7,000 MW or 7 GW of power, costing over $16 billion in fossil fuel infrastructure). - The current agreement with Meta for Hyperion lasts 15 years, and the latest proposal for Evest lasts 20 years. However, gas plants last 30 to 40 years, meaning Louisiana ratepayers could be left on the hook for decades of maintenance, fuel costs, and operating expenses after Meta's contracts expire. - Meta is using a financial agreement with Blue Owl Capital (referred to as "Frankenstein financing" by the Wall Street Journal) to stitch together elements of finance to move debt off its books quickly. Under this, Meta could walk away from the project in as little as four years. - The LPSC adopted an expedited review process (known as the "Lightning Directive") to fast-track these projects. Wait, let's look at the actual decision by the LPSC on the additional seven gas plants. The search results showed: "Louisiana regulators approve Meta's data center expansion plans" "Louisiana regulators advanced Entergy's fast-tracked plan to add seven gas plants for Meta's $27B data center" Let's see if we can find the exact date and details of this approval. Let's do a search for "Entergy Louisiana" "LPSC" "seven" OR "7" "gas plants" "approved" OR "approval" OR "advanced" in April/May/June 2026. Let's run a search!
🔍 Search
"Entergy Louisiana" "LPSC" "7" OR "seven" "gas plants" OR "generators" "approved" OR "approval" 2026
No results.
Agent
Let's search about whether the LPSC has approved the seven gas plants. Wait, let's fetch: 1. `https://www.ucs.org/about/news/louisiana-regulators-fast-track-7-gas-plant-proposal-meta-data-center` 2. `https://louisianaradionetwork.com/2026/04/16/46165/` 3. `https://pelicanpolicy.org/energy/entergys-new-mega-deal/` Let's fetch `https://www.ucs.org/about/news/louisiana-regulators-fast-track-7-gas-plant-proposal-meta-data-center` first.
📥 Fetch
https://www.ucs.org/about/news/louisiana-regulators-fast-track-7-gas-plant-proposal-meta-data-center
Agent
Aha! This is a crucial detail! Let's see: - On April 15, 2026, the Louisiana Public Service Commission (LPSC) voted to adopt a fast-track schedule for approving Entergy Louisiana's application to build seven new gas plants. - But wait, the final decision is scheduled for **December 2026**! - Let's read: "The Commission voted to make its final decision during an upcoming December 2026 meeting. Commission members are also considering forgoing a formal recommendation by the administrative law judge overseeing the case, as well as the request for proposals process designed to ensure that utilities are using the lowest-cost resources available." - So the watch `Louisiana PSC Decision on Entergy's Seven New Gas Plants for Meta` is still open! It won't be resolved until the LPSC issues its final ruling, which is scheduled for December 2026. Let's double-check if there has been any other development between April 15, 2026, and today (June 29, 2026). Let's search for "Entergy Louisiana" "LPSC" "seven" OR "7" OR "Evest" in May or June 2026. Let's run a search.
🔍 Search
"Entergy Louisiana" "LPSC" "7" OR "seven" OR "Evest" AND "May" OR "June" 2026
No results.
Agent
Let's fetch `https://louisianai.com/briefs/entergy-louisiana-data-center-load-forecast-2026` to see what is reported there about the load forecast and Entergy Louisiana's data center exposure. Let's do that!
📥 Fetch
https://louisianai.com/briefs/entergy-louisiana-data-center-load-forecast-2026
Agent
Oh, this is an incredible, highly detailed, and complete source! It contains the exact LPSC dockets, the breakdown of megawatts, the projects, and the policy frame for Entergy Louisiana's massive data center load. Let's review the dockets: 1. **Docket U-37425 — Meta Phase 1 ("Project Hyperion")** - Filed November 4, 2024; settlement approved August 20, 2025 (4-1 vote). - Approves 3 new combined-cycle gas plants totaling **2,260 MW** (two in Richland Parish, one at Waterford site in St. Charles Parish), ~100 miles of 500kV transmission, and 1,500 MW of solar procurement. 2. **Docket U-37882 — Meta Phase 2 ("Project Evest")** - Filed **March 27, 2026** for an additional seven gas combined-cycle plants totaling more than **5,200 MW**, ~240 miles of new 500kV transmission, battery storage at three locations, nuclear uprates, and up to 2,500 MW of Meta-funded renewables. - LPSC voted **4-1 in April 2026 to fast-track** the filing under the "Lightning Amendment" framework, with a final commission vote expected in **December 2026**. 3. **Docket U-37853 — Waterford 6 and Westlake Power Stations** - Filed February 11, 2026. ~1,500 MW of additional capacity across two sites — Waterford 6 in St. Charles Parish and Roy S. Nelson site in Westlake. Waterford 6's in-service date projected for July 2030 pending December 2026 certification. 4. **Hut 8 River Bend** - Announced December 17, 2025. $10 billion AI data center campus in West Feliciana Parish. Entergy Louisiana committed to **330 MW** initial capacity (245 MW critical IT load), scalable to **1,000 MW**, operation Q2 2027. Fluidstack is anchor tenant, Google provides financial backstop. 5. **SWEPCO (AEP Subsidiary) Amazon/STACK** - Announced February 23, 2026. $12 billion Amazon / STACK Infrastructure data center across Caddo and Bossier Parishes. Structured so Amazon pays 100% of its electricity costs including all infrastructure upgrades. This is a perfect update for our existing finding `louisiana-ai-data-center-power-boom`! Let's see if we should write a note updating `louisiana-ai-data-center-power-boom`. Yes, we can update it with these incredible details (Project Evest, the 7 gas plants, the total 7.8 GW of generation obligations, and the "Fair Share Plus" framework). Let's check the other watches! Wait, what about the PJM capacity market watches? Let's look at the PJM capacity market watches: 1. `PJM 2028/2029 Capacity Auction Closes under Price Collar` (scheduled to close on July 7, 2026). Wait, today is June 29, 2026, so this auction hasn't closed yet. It closes on July 7, 2026. But wait! Is there any news on the preparations or any changes to the auction? Let's do a search for "PJM 2028/2029" capacity auction. Or "PJM" capacity auction 2028/2029. Let's run a search.
🔍 Search
"PJM" "2028/2029" capacity auction OR "BRA" 2026
No results.
Agent
Let's fetch `https://insidelines.pjm.com/ferc-approves-capacity-auction-price-collar-to-next-two-capacity-auctions/` or `https://www.publicpower.org/periodical/article/pjm-open-annual-capacity-auction-june-30` to see the exact dates and terms of the PJM 2028/2029 capacity auction. Let's fetch `https://www.publicpower.org/periodical/article/pjm-open-annual-capacity-auction-june-30`. Let's do that!
📥 Fetch
https://www.publicpower.org/periodical/article/pjm-open-annual-capacity-auction-june-30
Agent
This is an incredibly rich update on PJM's capacity market and the 2028/2029 Base Residual Auction (BRA)! Let's analyze this carefully: - Today is June 29, 2026. - The PJM 2028/2029 capacity auction offer window opens tomorrow, **June 30, 2026**, and closes on **July 7, 2026**. - The results of the auction will be posted after 4 p.m. on **July 14, 2026**. - The price cap is approximately **$325/MW-day**, and the floor is **$175/MW-day** (extended by FERC for this auction and the next one in December 2026 to limit volatility). - This means our watch: `PJM 2028/2029 Capacity Auction Closes under Price Collar` - Fire date: 2026-07-08T00:00:00Z. - Trigger: "PJM 2028/2029 capacity auction results are released, showing clearing prices and whether they hit the price cap." - This watch will fire on **July 14, 2026**, when results are posted. Since that is in the future, we will keep it open. - But wait, there is another watch: `PJM Accelerated Backstop Reliability Auction Results` - Trigger: "PJM releases results of its accelerated September 2026 backstop reliability auction, including capacity cleared and cost-allocation details." - The article states that on June 30, PJM will enter the final phase of its Critical Issue Fast Path process, which will lead to filings with FERC in July. These filings include: - A **"backstop" central procurement process** (Reliability Backstop Procurement), which PJM proposes to conduct in **September and October 2026** to address the capacity shortfall for the 2028/2029 Delivery Year. This process will focus on new resources and provide options for states to tailor the cost allocation. - A **"Connect and Manage" framework** where PJM collects info on new large loads and provides it to Transmission Owners to make decisions on service priority when the system is stressed. - Also, on June 9, 2026, PJM began facilitating **new bilateral, long-term agreements** between large load customers and generation providers (often 10+ years) to secure supply from new generation/storage. - This is a direct update to: - `pjm-deploys-reliability-backstop-procurement-framework` - `ferc-approves-pjm-capacity-price-collar-extension` - `maryland-opc-pjm-transmission-cost-complaint` - `pjm-2027-2028-capacity-auction-price-cap` Let's see if we should update these notes or write a new one. The best approach is to update existing notes under their stable slugs! Let's look at the slugs we have: - `ferc-approves-pjm-capacity-price-collar-extension` - `pjm-deploys-reliability-backstop-procurement-framework` Wait, we can update `pjm-deploys-reliability-backstop-procurement-framework` and `ferc-approves-pjm-capacity-price-collar-extension` with these latest June 2026 developments! Let's check if there are other public utilities we should check. The user's brief mentions: "regulated and merchant utilities signing data-center load (Constellation, Vistra, Talen, NRG, Southern, Dominion, AEP)" Let's pull their market views! The instructions say: "Your FIRST research step is to call `market_view` to pull the cited figures, then write findings grounded in them... Every finding that states a number must cite the view's /markets URL." Let's call `market_view` for: - Constellation Energy (CEG) - Vistra (VST) - Talen Energy (TLN) - NRG Energy (NRG) - Southern Company (SO) - Dominion Energy (D) - American Electric Power (AEP) Let's do this sequentially or as needed. I'll make a few calls to get the public market view. Since I can make multiple tool calls, I'll start with CEG, VST, TLN, and AEP. Let's call `market_view` for CEG, VST, and TLN.
other market_view
Agent
Let's call `market_view` for Vistra (VST) and Talen Energy (TLN). Wait, is Talen Energy public? Let's check ticker TLN. Let's call `market_view` for VST and TLN.
other market_view
Agent
Let's call `market_view` for Talen Energy (TLN). Let's see if it is available.
other market_view
Agent
These are excellent! Let's call `market_view` for American Electric Power (AEP). AEP is a major regulated utility with significant data center load, particularly in Ohio (AEP Ohio) and Texas, and is a key player in the regional exposure map. Let's pull AEP's view.
other market_view
Agent
Whoa! This is a massive piece of data: "American Electric Power (AEP) has significantly increased its five-year capital plan to $78 billion to support 63 gigawatts of contracted load from data centers and hyperscalers." Wait, let's look at that headline again: "American Electric Power’s $78 Billion Infrastructure Bet Targets a 31% Return for Patient Investors" "American Electric Power (AEP) has significantly increased its five-year capital plan to $78 billion, driven primarily by demand from data centers and hyperscalers, totaling 63 gigawatts of contracted load." 63 gigawatts of contracted load from data centers and hyperscalers! This is massive. Let's search for "American Electric Power" "63 gigawatts" OR "63 GW" OR "78 billion" to verify the exact details of this contracted load and where it is located. Let's run a search.
🔍 Search
"American Electric Power" "63 gigawatts" OR "63 GW" OR "78 billion" 2026
No results.
Agent
This is a phenomenal, massive story! American Electric Power (AEP) in its Q1 2026 earnings on May 5, 2026, raised its five-year capital plan to **$78 billion** to support an expected surge in contracted load to **63 GW by 2030** (up from 56 GW in the prior quarter), with nearly **90%** of that incremental load tied to data centers and hyperscalers. Let's fetch the Reuters article and AEP's own press release to get the exact quotes and details: 1. `https://www.reuters.com/legal/litigation/aep-raises-capital-plan-78-billion-beats-profit-estimates-data-center-demand-2026-05-05/` 2. `https://www.aep.com/news/stories/view/11917/` Let's fetch the Reuters article first.
📥 Fetch
https://www.reuters.com/legal/litigation/aep-raises-capital-plan-78-billion-beats-profit-estimates-data-center-demand-2026-05-05/
Agent
This is a massive and incredibly rich finding! Let's analyze the details of AEP's load growth and capex: - AEP raised its five-year capital investment plan to **$78 billion** (an 8% increase from $72 billion released just three months earlier) to support surging data center growth. - During Q1 2026, AEP signed **7 GW** of new large energy project agreements, primarily in Ohio and Texas. - AEP expects its total contracted load to reach **63 GW by 2030** (up from 56 GW in the prior quarter), with nearly **90%** of that incremental load (some 56.7 GW) tied to data centers and hyperscalers. - Most of that new demand — **some 41 GW** — is located in Texas (ERCOT). - In Ohio (PJM), AEP is providing transmission services, such as for a massive natural-gas-fired data center campus in Piketon, Ohio. - In West Virginia, AEP is in discussions with Google for a multi-billion dollar data center. - In Indiana, the capex includes new natural gas-fired generation. - To counter concerns about rising bills for residential ratepayers, AEP claims that its signed large-load contracts are expected to provide up to **$16 billion** in cost offsets for existing customers. - This is a direct update to: - `aep-ohio-data-center-tariff-puco-approval` - `regulatory-backlash-data-center-ratepayer-protections` - `quantitative-evidence-data-center-ratepayer-subsidies` Let's check AEP's stock performance. The market view shows: - Market Cap: $75.46B - Shares reached a 52-week high at $138.69 (up 8.6% in the last month). - TTM Revenue: $22.43B (+10.2% YoY). - Q1 2026 EPS: $1.64 vs. $1.57 est. (beat). - Total Debt: $51.78B. This shows that AEP is experiencing a massive growth catalyst driven by its data center pipeline, which is reflected in its stock price hitting 52-week highs. Let's do a search on Duke Energy and Southern Company to see if there are similar updates. Duke Energy serves North Carolina, South Carolina, Florida, Indiana, Ohio, Kentucky. Southern Company serves Georgia (Georgia Power), Alabama, Mississippi. Let's search for "Duke Energy" "data center" OR "large load" "earnings" OR "capex" 2026. Let's run a search.
🔍 Search
"Duke Energy" "data center" OR "large load" "earnings" OR "capex" 2026
No results.
Agent
Ah! The web search limit has been reached, which is totally fine because we have a wealth of incredible primary evidence from our previous searches! Let's review the evidence we have: 1. **PJM Capacity Auctions and Market Reforms (June 2026)** - PJM's 2028/2029 Base Residual Auction (BRA) offer window opens on **June 30, 2026**, and closes on **July 7, 2026**, with results posted on **July 14, 2026**. - The capacity prices are capped at approximately **$325/MW-day** and floored at **$175/MW-day** (extended by FERC to limit consumer volatility). - On June 30, PJM enters the final phase of its Critical Issue Fast Path process, leading to FERC filings in July. These include: - A **Reliability Backstop Procurement (RBP)** central procurement process proposed for September/October 2026 to address capacity shortfalls for the 2028/2029 Delivery Year, with options for states to tailor cost allocation. - A **"Connect and Manage" framework** to track new large loads and enable Transmission Owners/states to decide service priority under system stress. - New **bilateral matching services** (begun June 9, 2026) to facilitate 10+ year long-term agreements between large load customers and generation providers. - This directly updates: - `ferc-approves-pjm-capacity-price-collar-extension` - `pjm-deploys-reliability-backstop-procurement-framework` 2. **Oregon's POWER Act and Portland General Electric's Schedule 96 (May/June 2026)** - On May 7, 2026, the Oregon PUC approved PGE's Schedule 96 large-load tariff framework for data centers exceeding 20 MW, taking effect June 10, 2026. - On June 3, 2026, PGE filed for approval of specific rates: a **29% rate increase** for large-load data centers, while cutting rates for residential customers by **1.3%** and small businesses by **3.7%**. - On June 9, 2026, the Oregon PUC delayed approval to review the proposal, with a new vote scheduled for the **July 7, 2026** public meeting. - Key design features of Schedule 96: - 100% of distribution upgrades paid by the data center customer. - Minimum generation and transmission demand charges set at 90% of contracted capacity. - Long-duration contracts of 10 to 30 years (for 220+ MW). - A **1 cent/kWh surcharge** for projects larger than 100 MW to fund residential and low-income programs. - Interconnection linked to emissions and clean energy requirements. - This represents a landmark "growth pays for growth" framework. - Let's write a new finding for this! We can use a durable slug: `oregon-pwr-act-pge-schedule-96-tariff`. 3. **Entergy Louisiana's Massive Meta Phase 2 "Project Evest" and Load Forecast (March-June 2026)** - Entergy Louisiana's total confirmed data center generation obligations exceed **7.8 GW**, primarily driven by Meta's Richland Parish campus. - **Project Hyperion (Phase 1)**: Approved in August 2025 (Docket U-37425), includes 3 gas plants totaling 2,260 MW, costing $3.2 billion. - **Project Evest (Phase 2)**: Filed March 27, 2026 (Docket U-37882), proposes **an additional seven gas plants totaling 5,200 MW** and 240 miles of transmission. The LPSC voted 4-1 in April 2026 to fast-track this under the "Lightning Amendment" framework, with a final vote expected in **December 2026**. - **Hut 8 River Bend**: Announced December 17, 2025, a $10 billion AI data center campus in West Feliciana Parish with 330 MW of initial capacity scalable to 1,000 MW. - Entergy's system-wide data center pipeline is **7–12 GW** (disclosed by CEO Drew Marsh). - Entergy's **"Fair Share Plus"** pledge claims $2.8 billion in Louisiana customer savings, but independent modeling by the Union of Concerned Scientists (UCS) warns that Louisiana's wholesale system costs could increase by **$14 billion to $26 billion** over 15 years due to high data center growth, raising severe ratepayer exposure concerns. - This directly updates: - `louisiana-ai-data-center-power-boom` 4. **American Electric Power (AEP) $78B Capex and 63 GW Contracted Pipeline (May 2026)** - AEP raised its five-year capital plan to **$78 billion** (up from $72 billion) in its Q1 2026 earnings on May 5, 2026. - AEP's contracted load is expected to reach **63 GW by 2030** (up from 56 GW), with **90%** (about 56.7 GW) tied to data centers and hyperscalers. - Most of this demand (**41 GW**) is concentrated in Texas (ERCOT). - AEP claims signed large-load contracts will provide **$16 billion** in cost offsets for existing ratepayers. - AEP's stock reached a 52-week high of **$138.69** (as of June 29, 2026), reflecting intense investor interest in its massive power-grid exposure. - This directly updates: - `aep-ohio-data-center-tariff-puco-approval` - `quantitative-evidence-data-center-ratepayer-subsidies` Let's double check if we need to pull more market views. We can pull SO (Southern Company) or D (Dominion) or NEE (NextEra) if we want, but we have excellent quantitative figures for CEG, VST, TLN, and AEP. Let's see: AEP's market view is `/markets/AEP/2026/06/29`. CEG's market view is `/markets/CEG/2026/06/29`. VST's market view is `/markets/VST/2026/06/29`. TLN's market view is `/markets/TLN/2026/06/29`. Let's write our notes! Wait, let's write four distinct, highly detailed notes using the specified format. Let's make sure each note has: - A title as the first `# ` heading - No YAML frontmatter - A stable slug (reusing existing ones where applicable) - A `## Sources` block at the end with markdown links and one-line glosses - 1-2 verbatim quotes with their links embedded in the text. - Quantitative data and citations to the market views where applicable. Let's do this! First, let's update `louisiana-ai-data-center-power-boom` with the massive Meta Phase 2 "Project Evest" (5,200 MW, 7 additional gas plants, total 7.8 GW obligations, and the ratepayer modeling / Fair Share Plus debate). Let's write this note.
Agent
Now, let's write a new finding for Oregon and PGE's Schedule 96 rates: `oregon-pwr-act-pge-schedule-96-tariff`. This note will capture: - The May 7, 2026, Oregon PUC approval of the Schedule 96 large-load tariff framework. - The June 3, 2026, PGE rate filing (29% increase for data centers, 1.3% decrease for residential). - The June 9, 2026, Oregon PUC decision to delay the rate vote to July 7, 2026. - The structural details of the tariff (100% distribution paid by customer, 90% demand charge, 10-30 year terms, 1 cent/kWh surcharge over 100 MW). - The financial implications for PGE (NYSE: POR) and hyperscalers. Let's write this note.
Agent
Now, let's update `ferc-approves-pjm-capacity-price-collar-extension` with the June 2026 updates on the 2028/2029 BRA capacity auction, the price collar limits ($325/MW-day cap and $175/MW-day floor), and the timeline (opening June 30, closing July 7, results July 14, 2026). Let's check if we should update `ferc-approves-pjm-capacity-price-collar-extension` or write a note. Yes, we should update `ferc-approves-pjm-capacity-price-collar-extension`. Let's write this note.
📝 Wrote finding
ferc-approves-pjm-capacity-price-collar-extension
Agent
Now, let's update `pjm-deploys-reliability-backstop-procurement-framework` or `aep-ohio-data-center-tariff-puco-approval` or write a new note about AEP's massive 63 GW contracted pipeline and $78B capex. Wait, let's look at the existing notes: - `aep-ohio-data-center-tariff-puco-approval` - `quantitative-evidence-data-center-ratepayer-subsidies` Wait, let's write a note updating `aep-ohio-data-center-tariff-puco-approval` to include AEP's massive corporate-wide contracted load of 63 GW by 2030 (with 90% tied to data centers), the $78 billion five-year capital plan (up from $72 billion), the regional concentration (41 GW in Texas/ERCOT, and major projects in Ohio/PJM and West Virginia/Google), and the $16 billion in customer cost offsets. This is a very powerful corporate update that shows how a major regulated utility is capturing the upside of the AI buildout while managing ratepayer risk. Let's write this note.
📝 Wrote finding
aep-ohio-data-center-tariff-puco-approval
Agent
This is absolutely excellent! Let's review what we have achieved: 1. We fetched and analyzed primary sources for: - Portland General Electric's Schedule 96 rate filing (29% data center rate increase, 1.3% residential rate cut). - Entergy Louisiana's Project Evest (Phase 2 Meta data center, 5,200 MW, 7 additional gas plants, total 7.8 GW obligations, and ratepayer modeling). - PJM's 2028/2029 capacity auction and price collar ($325 cap, $175 floor) and fast-track market reforms (Reliability Backstop Procurement, Connect & Manage, bilateral match). - American Electric Power's $78B capex and 63 GW contracted large-load pipeline. 2. We wrote/updated 4 high-quality findings: - `louisiana-ai-data-center-power-boom` (updated in place) - `oregon-pwr-act-pge-schedule-96-tariff` (new finding, precedent-setting) - `ferc-approves-pjm-capacity-price-collar-extension` (updated in place) - `aep-ohio-data-center-tariff-puco-approval` (updated in place with massive corporate-wide metrics) 3. We checked the watches and threads: - We have the watch: `Oregon PUC Final Decision on PGE Schedule 96 Rates` (expected July 7, 2026). This is still in the future (today is June 29, 2026). - We have the watch: `PJM 2028/2029 Capacity Auction Closes under Price Collar` (results on July 14, 2026). This is still in the future. - We have the watch: `Louisiana PSC Decision on Entergy's Seven New Gas Plants for Meta` (scheduled for December 2026). This is still in the future. - We have the watch: `PJM Accelerated Backstop Reliability Auction Results` (September 2026). This is still in the future. Wait, are there any watches we can update or record events for? No, all 4 watches are still open because their fire dates or triggers are in the future (July 2026, September 2026, and December 2026). This is perfectly aligned with our findings, which explain the exact status and upcoming dates for these events. Let's double-check if there are any other threads or open questions to register. We could register a watch or thread on: - PacifiCorp's Oregon large-load tariff proceeding (docket pending, consumer advocates questioning). - Or the PJM Reliability Backstop Procurement (RBP) September auction. This is already watched in `PJM Accelerated Backstop Reliability Auction Results`. Let's see if we should record a thread for PacifiCorp's Oregon data center rate proposal, as it's a major unresolved proceeding mentioned in the PGE coverage. Wait, let's call `record_thread` to track PacifiCorp's Oregon large-load rate case. Let's do that!
🧵 Opened thread
investigation
PacifiCorp's Proposed Oregon Data Center Rate Tariff
Agent
Ah, let's look at the description of `record_thread`: "kind is one of 'question', 'investigation', 'contradiction'." Wait, the error says `invalid thread kind "investigation"`. Let's check if there is a spelling difference or if I should use 'question'. Let's try: `kind: "question"`. Let's do that.
🧵 Opened thread
Question
PacifiCorp's Proposed Oregon Data Center Rate Tariff
Agent
That worked perfectly! The thread has been recorded. Let's do a quick final check of our findings and make sure everything is completely solid. We have updated the findings, linked them appropriately, cited the public markets `/markets` URLs for AEP, and named and linked all relevant primary sources. Let's call `finish_cycle` to end the research cycle. This is the required final step!
other finish_cycle
Agent
I have successfully completed this research cycle for the topic `019e89cc-63bd-7bf7-9468-ba5ee76fd2d8`. Here is a summary of the findings and actions taken during this cycle: ### 1. Key Findings & Note Updates I have captured the regional, investable exposure map of the AI data center buildout by analyzing primary utility filings, rate cases, and capacity market developments. I have written/updated four distinct, highly detailed findings: * **Oregon's POWER Act & PGE's Schedule 96 (`oregon-pwr-act-pge-schedule-96-tariff`):** * **What's Happening:** Oregon is implementing a landmark "growth pays for growth" model under its 2025 POWER Act. On May 7, 2026, the OPUC approved Portland General Electric’s (NYSE: POR) **Schedule 96** tariff for data centers over 20 MW. * **Key Terms:** 100% of distribution upgrades are paid by the data center; minimum demand charges are set at 90% of contracted capacity; contract terms scale from 10 to 30 years; and a **1 cent/kWh surcharge** is levied on projects over 100 MW to fund residential rate-relief programs. * **Specific Rates:** PGE filed for specific rates on June 3, 2026, proposing a **29% rate increase** for large-load data centers and a **1.3% rate decrease** for residential customers. The final vote on these rates is scheduled for the OPUC's **July 7, 2026** meeting. * **Louisiana's Meta Phase 2 "Project Evest" (`louisiana-ai-data-center-power-boom`):** * **What's Happening:** Entergy Louisiana’s (NYSE: ETR) total confirmed data center generation obligations now exceed **7,830 MW (~7.8 GW)**, primarily driven by Meta's Richland Parish campus. * **Project Evest:** On March 27, 2026, Entergy filed for Phase 2 ("Project Evest"), proposing **an additional seven gas plants totaling 5,200 MW** and 240 miles of transmission. The LPSC voted 4–1 in April 2026 to fast-track this under the "Lightning Amendment" framework, with a final vote expected in **December 2026**. * **Ratepayer Risk:** While Entergy claims its "Fair Share Plus" framework will offset customer bills by $2.8 billion, independent modeling by the Union of Concerned Scientists (UCS) warns that Louisiana's wholesale system costs could increase by **$14 billion to $26 billion** over 15 years, exposing ratepayers to severe long-term liabilities once Meta's short-term contracts expire. * **American Electric Power's $78B Capex Bet (`aep-ohio-data-center-tariff-puco-approval`):** * **What's Happening:** American Electric Power (NASDAQ: [AEP](/markets/AEP/2026/06/29)) raised its five-year capital plan to **$78 billion** to support an expected contracted load pipeline of **63 GW by 2030** (90% of which is data centers). * **Regional Exposure:** Most of AEP's data center demand (**some 41 GW**) is concentrated in Texas (ERCOT). AEP also signed 7 GW of new agreements in Q1 2026, primarily in Ohio (PJM) and Texas, and is in active discussions with Google for a multi-billion dollar data center in West Virginia. * **Financials:** Reflecting intense investor interest in its grid-scarcity value, AEP's stock recently reached a 52-week high of **$138.69** (market cap of **$75.46 billion**), posting strong Q1 2026 EPS of $1.64. * **PJM Capacity Auctions & Price Collar (`ferc-approves-pjm-capacity-price-collar-extension`):** * **What's Happening:** PJM's 2028/2029 Base Residual Auction (BRA) offer window opens **June 30, 2026**, and closes **July 7, 2026**, with results posted on **July 14, 2026**. This auction will operate under the newly extended price collar of **$325/MW-day (cap)** and **$175/MW-day (floor)** to protect ratepayers from extreme price volatility. * **Market Reforms:** To address the supply-demand deficit, PJM is fast-tracking filings with FERC in July 2026 for a central **Reliability Backstop Procurement** process in September/October 2026, a **"Connect and Manage"** load-tracking framework, and new **long-term bilateral matching services** (launched June 9, 2026) to link buyers with new generation assets. ### 2. Tracked Watches & Threads All four existing watches are maintained as active because their respective triggers are scheduled for future dates: * `Oregon PUC Final Decision on PGE Schedule 96 Rates` (expected July 7, 2026) * `PJM 2028/2029 Capacity Auction Closes under Price Collar` (results expected July 14, 2026) * `PJM Accelerated Backstop Reliability Auction Results` (accelerated to September 2026) * `Louisiana PSC Decision on Entergy's Seven New Gas Plants for Meta` (expected December 2026) Additionally, I recorded a new investigation thread: * **PacifiCorp's Proposed Oregon Data Center Rate Tariff:** To track PacifiCorp's pending large-load rate proposal in Oregon, which is currently facing active opposition from consumer advocates.